CIVIL ENGINEER LATEST PROJECTS

PROJECT | 1

Project | Rampura-Amulia-Demra Expressway 3d Animation & Simulation

Office   | Maks Inc

PROJECT | 2

Project | Freight Analysis Framework (FAF)

Office   | Maks Inc

  • Project Description & My Duties                                                                        Read More......

    The Freight Analysis Framework (FAF), produced through a partnership between BTS and FHWA, integrates data from a variety of sources to create a comprehensive picture of freight movement among states and major metropolitan areas by all modes of transportation. Starting with data from the 2012 Commodity Flow Survey (CFS) and international trade data from the Census Bureau, FAF incorporates data from agriculture, extraction, utility, construction, service, and other sectors. The major activities under this project is record and document details of map updates, additions or deletions.

PROJECT | 3

Project | VEHICLE Inventory - Federal Highway Administration (USA).

Office   | Maks Inc.

  • Project Description & My Duties                                                                        Read More......

    Federal Highway Administration (FHWA) has invested in a number of efforts to improve the understanding of the operational and physical characteristics of the on-road vehicle fleet and how vehicle dimensions and loading interacts with the pavement. Although there have been few changes in Federal policies governing overall vehicle dimension and weight characteristics since 1994, there have been significant changes in vehicle body type, axle configuration, and tire spacing/design to improve the safety and fuel efficiency of trucks. In addition, through their permit processes for over-weight and over-dimension vehicles, States have been allowing the operations of special trucks to support in-state manufacturing, as well as the agriculture and forestry industries. Given the significant changes in vehicle configurations and various new vehicles on the roadway, FHWA has sponsored this study to revisit its 13 current vehicle categories and enhance its vehicle inventory with pictorial illustrations and associated body, axle and tire dimensions. The major activities under this project are:

    • Prepare drawings of 650 different types of USA vehicle with dimensions.
    • Research on vehicle body type, axle configuration, tire spacing and design.
    • Analyze task problems and provide solutions.
    • Maintain and update drawings and document.
    • Designed template with Illustrations using Photoshop.
    • Maintained and organized CAD files and hard copies of existing drawings.

PROJECT | 4

Project | Laldia Bulk Terminal (PPP Project)

Office   | Maks Inc.

  • Project Description & My Duties                                                                        Read More......

    Setting up a dedicated terminal with specialist equipment to handle bulk cargo. Enhancing capacity at Chittagong Port to deal with additional cargo volumes and meet future demand. Enhancing operational performance at Chittagong Port and reducing ship waiting time. The major activities under this project are:

    • Create drawings from written and verbal specifications obtained from Project Engineer.
    • Work with Engineers regarding model accuracy, design, drafting standards and design    documentation.
    • Work closely with Designers and Engineers to ensure coordination design effort is maintained.
    • Review drawings for completeness and accuracy.
    • Maintain all revisions of project drawings.
    • Update and maintain drafting log.
    • Examine and check engineering drawings for compliance with cited specifications.
    • Provide timely technical assistance and solutions to the team.
    • Prepare engineering documents for client submittal.

PROJECT | 5

Project | Dhaka by Pass (RHD Project)

Office   | Maks Inc.

  • Project Description & My Duties                                                                        Read More......

    The objective of the project is to provide an alternate route for road users with high level of travel time reliability and reduced vehicle operating cost in National Highway N105. The upgrading of the road will also enhance the connectivity of the road network to meet forecast economic and traffic growth targets. The major activities under this project are:

     

    • Handle complex designing and drafting assignments under minimal supervision.
    • Maintain all revisions of project drawings.
    • Develop 3D models by analyzing prototypes and 2D drawings.
    • Analyze GIS data problems and provide immediate resolutions.
Free Web Hosting